Electrostatic Detector Operation Instruction  MODEL: SD-H

SKU: SD-H

Electrostatic Detector Operation Instruction 

1.To ensure accurate measurement, please release the static electricity of your body before measuring.

2.Press the power button to turn it on, and then press the Zero button to clear the screen data

3.Hold the meter from far to near 7cm away from the surface to be tested, you will get the figure soon , the unit is KV

4.After use, press the power button to shut down and place it properly.

Repeat steps 1 to 4 for each measurement

Only use a damp cloth to wipe

Power supply: 1 dedicated 9V alkaline battery

Do not disassemble or replace batteries in hazardous locations

Please replace the battery in time when the undervoltage flag(LOBAT) is displayed in the upper right corner of the screen. 

Chia sẻ:

Categories Static Grounding Monitoring System
Brand ALPTEC Static Grounding Solutions Manufacturer
Model SD-H
Measurement method contact
Measurement rate 3 times/s
Respond Time 0.1 S