Powder conveying system from the drum mounted on a Lifting Column for drums into a Bin through the Mill installed on another Lifting Column with subsequent mixing of Pharma Bin.
Powder transport from the Big Bag Emptying Structure (loaded with hoist) into the reactor by VTS (Vacuum Transfer System) in PED execution with the ferrule of vapor collector.
Reactor charging system 1.2 (with shredder mini)

Powder transfer from the Big Bag Emptying Structure (loaded with forklift) into the reactor by Suction Conveying System in PED execution with the ferrule of vapor collector.
Powder conveying from the Big Bag Discharging Station (loaded with forklift), equipped with rotary valve and lump breaker at the outlet point; loading the reactor through Vacuum Transport System in PED execution with the ferrule of vapor collector.

"Bin to Bin" powder handling system through a Mill installed on a Mobile lifting column with subsequent Bin mixing phase and loading of the packaging machine using BIN Blender Column.